Delray Beach design-build contractor

How KMR Works: Process, Payments and Warranty

You should know what happens, what it costs and when payments are due before we start. Here is how every KMR project runs, from the first visit to the final walkthrough.

Book a Free ConsultationCall (561) 288-5000

The process

Six steps, start to finish

Finished contemporary kitchen with wall ovens and island, built by KMR Enterprises
Finished
Boynton Beach kitchen before remodel, KMR Enterprises
Before
Garage conversion framing in progress, Delray Beach
Framing
  1. Discovery. A free consultation at your property. We listen to your goals, budget range and timing.
  2. Proposal and design. An itemized proposal with scope, realistic allowances, timeline and specs. On design-build work we line up design and construction early so the plan matches the budget.
  3. Permitting and pre-construction. We handle the permit applications and follow-up with the building department, order long-lead items and schedule the trades.
  4. Construction. Work follows the schedule, with daily logs and photos in JobTread. Unexpected conditions are documented and approved in writing before extra work.
  5. Final walkthrough. We walk the project with you before final payment, document punch items, close permits and hand over warranties, manuals and care notes.
  6. After the project. Questions and warranty items are welcome. Many clients come back for their next phase.

Timelines vary by scope. Every proposal includes a schedule for your specific project.

Recent work

A Delray Beach remodel, start to finish

A full remodel in Delray Beach: floors, doors, kitchen, baths and closets, with some rooms resized.

Payments

One clear payment schedule

Your proposal spells out what is included, what is not and when each payment is due, before work starts.

Wellington kitchen remodel with island and navy backsplash by KMR Enterprises
5
milestone payments

Each one is tied to a project milestone, from signing to substantial completion.

Milestone Payment
At signing 10%
Demolition complete 20%
Major materials ordered 30%
Those materials delivered 30%
Substantial completion 10%

Changes happen only by written change order, signed by you and KMR management. Price and time impacts are agreed before the work, so there are no surprise add-ons from verbal field promises.

Systems

Permits and progress you can see

Boynton Beach kitchen before remodel
Before
Boynton Beach kitchen after remodel by KMR Enterprises
After

Boynton Beach kitchen, before and after.

Inspected.com

We use Inspected.com for permit submittals and follow-up with local building departments. It keeps municipal paperwork organized so the job does not stall waiting on stamps, and it helps inspections get scheduled once work is ready.

JobTread

Your project lives in a client portal with the schedule, daily logs, photos and messaging, plus selections and documents in one place. Updates are time and date stamped, so you can see what happened on site without chasing texts. Written records also help with lenders and HOAs.

Boca Raton home remodel family room by KMR Enterprises1 year
workmanship warranty

Warranty

One-year workmanship warranty

KMR warrants its workmanship for one year from substantial completion. Materials carry the manufacturer’s warranties. We hand over warranties, manuals and care notes at the final walkthrough. Certificates of insurance for your building, lender or property manager are available on request, and you can verify our license anytime at MyFloridaLicense.com (CGC1520685).

Common questions

How KMR works: FAQ

K
L
What is KMR's payment schedule?

10% at signing, 20% when demolition is complete, 30% when major materials are ordered, 30% when those materials are delivered and 10% at substantial completion. Your written proposal shows the exact amounts.

K
L
Does KMR warrant its work?

Yes. Workmanship is warranted for one year from substantial completion, and materials carry the manufacturer's warranties.

K
L
Who handles the building permit?

KMR prepares and submits the permit applications and follows up with the building department, supported by Inspected.com.

K
L
How do changes to the plan get approved?

Only by written change order signed by you and KMR management, with the price and time impact agreed before the extra work starts.

K
L
How will I know how the project is going?

Your JobTread portal shows the schedule, daily logs, photos and messages, and you have direct access to your project lead.

Ready to talk about your project?

Tell us what you want to change, your timing and your budget range. We will walk the site, ask practical questions and follow with a clear written proposal. See our kitchen remodeling, bathroom remodeling and ADU services.