If you are searching for a permit expediter or permitting service in Palm Beach County, the right answer depends on one question: who is going to build the work? A permit expediter can save real time in some situations. In others, it adds a middle layer between the building department and the people who actually drew and will build your project.

The short answer. If you are hiring a licensed general contractor to remodel, add on or build, the contractor should pull the permit, answer the reviewer and call the inspections, and you usually do not need an expediter. An expediter is worth paying for when there is no contractor running the permit: realtors and sellers clearing open or expired permits before a closing, owner-builders, and commercial tenants whose architect needs help moving an application through review.

Framing for a garage conversion in Delray Beach by KMR Enterprises, ready for inspection
Framing on a KMR Enterprises garage conversion in Delray Beach. Each phase like this one is inspected before the walls close, so the permit runs from submittal all the way through final inspection.

What does a permit expediter actually do?

A permit expediter manages the paperwork side of a permit. Typical services include:

  • Researching the property: zoning, existing permits, and any open or expired permits on record.
  • Assembling and submitting the application on the city or county portal, usually as your authorized agent.
  • Tracking the review and relaying reviewer comments to whoever produced the plans.
  • Following up with the building department and scheduling where the jurisdiction allows it.

What an expediter does not do is build the work. In Florida, a permit for contracted work is issued to a licensed contractor who is responsible for it, or to an owner-builder who takes on that responsibility for their own property. The expediter helps the application move; the contractor or owner-builder is still the one accountable to the building department.

What should your contractor already handle?

On a remodel, addition or new build with a licensed general contractor, permitting is part of the job. A design-build contractor goes further, because the same team that drew the plans also answers the review comments:

  1. Drawings. Code-complete plans, engineering and product approvals for windows and doors, prepared so the first submittal is clean.
  2. Submittal. The application filed with the right city or the county, depending on where the property sits.
  3. Comments. Reviewer comments answered directly by the people who drew the plans, often in days instead of weeks.
  4. Inspections. Each phase called and passed, from foundation and framing to the trade rough-ins and finals.
  5. Close-out. Final inspections cleared and, where required, a certificate of occupancy or completion issued.

For the full sequence, see how the building permit process works in Palm Beach County.

When is a permit expediter worth paying for?

Realtors and sellers with open permits

A permit that never got its final inspection stays open on the record, and title searches often flag it before closing. An expediter can research the history and line up what is needed to close it out.

Owner-builders

Florida lets owners permit work on their own home as owner-builders, with restrictions. If you are taking that route, an expediter can help with the application side you would otherwise handle alone.

Commercial tenants with their own architect

When the architect and the builder hold separate contracts, an expediter can keep a tenant improvement application moving through zoning, building and fire review.

When does an expediter add a layer you do not need?

A remodel with a licensed contractor

If your contractor already pulls permits in your city regularly, an expediter duplicates work you are already paying for.

Design-build projects

The biggest delay in permitting is the comment cycle. When the designer and builder are one team, comments go straight to the people who can fix the drawings. Adding a go-between slows that down.

Speed alone

If the goal is faster review, a private provider (below) changes the timeline more than anyone chasing the same review queue.

Expediter, contractor or private provider: who does what?

What they do Best for Limits
Permit expediter Researches permit history, prepares and submits applications as your agent, tracks review and relays comments Open or expired permits before a sale, owner-builders, commercial tenants with a separate architect Does not build the work or act as contractor of record
Design-build general contractor Draws the plans, submits, answers comments, builds and passes inspections through close-out Homeowners remodeling, adding on or building You are hiring them for the whole project, not just the permit
Private provider Licensed plan review and inspections in place of the building department's own reviewers Shortening review and inspection waits on a project already moving Adds a fee, and you still need a licensed contractor or an owner-builder

How long does a permit take in Palm Beach County?

Simple residential permits with clean submittals commonly clear in four to eight weeks. Projects with structural work, several trades or comment cycles run two to five months, and each comment cycle can add two to six weeks. The number of comment cycles is set by the quality of the first submittal, which is why who prepares the drawings matters more than who files them.

Florida law (section 553.791 of the Florida Statutes) lets an owner or the owner's contractor hire a private provider, a licensed professional who handles plan review, inspections or both in place of the building department. On a typical kitchen, that adds about $1,500 and can save 4 to 8 weeks on overall completion.

Who issues the permit: the city or the county?

It depends on where the property sits. Incorporated cities such as Delray Beach, Boca Raton, Boynton Beach and West Palm Beach run their own building departments. Unincorporated land goes through Palm Beach County Planning, Zoning and Building. The Florida Building Code is the same statewide, but review times, portals and inspector practices differ from city to city, which is why a contractor who permits in your city every month clears review faster. Our guides to permits for a home addition in Delray Beach and ADU permits, cost and timeline cover two common project types.

What do KMR clients say about the permit side?

“Kris kept an open line of communication throughout the process and worked diligently with the Building Department to obtain the permit and inspections.”

Barry D. · Office renovation · Google review

“Older building, restrictive building department, HOA oversight… He navigated the complex permitting process for what we wanted to do with seeming ease.”

Jane S. · Condominium renovation · Google review

Remodeled kitchen with island at Seagate at The Hamlet in Delray Beach by KMR Enterprises
A KMR Enterprises remodel at Seagate at The Hamlet in Delray Beach, permitted, built and closed out by the same team.

Frequently asked questions

Do I need a permit expediter in Palm Beach County?

Not if a licensed general contractor is doing the work, since pulling the permit, answering comments and calling inspections is part of their job. An expediter is most useful for clearing open or expired permits before a sale, for owner-builders, and for commercial tenants whose architect and builder are separate.

Who pulls the permit, me or my contractor?

For contracted work, the licensed contractor pulls the permit and is responsible for it. Owners can pull permits for their own property as owner-builders, but then they take on the contractor's legal responsibilities.

How long does a building permit take in Palm Beach County?

Simple residential permits with clean submittals commonly clear in four to eight weeks. Structural work, several trades or comment cycles push it to two to five months.

What is a private provider in Florida?

A licensed professional the owner or contractor can hire, under section 553.791 of the Florida Statutes, to handle plan review, inspections or both in place of the building department. On a typical kitchen it adds about $1,500 and can save 4 to 8 weeks.

How do you close out an open permit before selling a house?

An open permit usually needs its final inspection passed. If the original contractor is no longer available, another licensed contractor can often take the permit over through the building department's change-of-contractor process, then schedule the remaining inspections. Requirements vary by city.

Want the permit handled by the team that builds it?

Design-build general contractor in Delray Beach, FL. Remodels, additions, ADUs, custom homes and commercial build-outs across Palm Beach County.

KMR Enterprises, Florida Certified General Contractor CGC1520685. Call (561) 288-5000 or tell us about your project.

More permit guides and services