A kitchen remodel goes well or badly in the first month, before anyone touches a wall. Most of the surprises homeowners in Delray Beach run into come from decisions made late: cabinet lead times, an appliance that changes the electrical plan, a permit question nobody asked.

Here is how we plan a kitchen in the order that avoids them.

Grey contemporary kitchen with stacked wall ovens, KMR Enterprises
A contemporary kitchen with stacked wall ovens. Appliance choices like these are settled before the electrician starts.

1Start with how you cook, not what it looks like

The layout is the one thing you cannot fix later. Before finishes, we map who cooks, how many people are in the room at once, where the cleanup happens and where guests stand. An island that looks right in a photo can block the path between the fridge and the range. Moving a sink or a range is a plumbing or gas decision that touches the slab or the ceiling, so it belongs in the first conversation, not the third.

2What “high end” means in a South Florida kitchen

In Delray Beach, a high-end kitchen is usually a few specific choices more than a price tag:

  • Cabinets that handle humidity. Moisture and salt air are hard on cheap boxes and thin finishes. Ask what the cabinet boxes are made of and how the finish is rated.
  • Stone or quartz that fits the use. A waterfall island looks the same in the showroom as in your kitchen, but edge details and seams are where quality shows.
  • Real ventilation. A range hood that vents outside, sized to the range.
  • Lighting in layers. Task lighting under cabinets, general lighting overhead, accent lighting where it earns its place.
  • Impact-rated windows and doors, where the kitchen has them. Replacing them is often its own permit.

Our Boynton Beach and Wellington kitchens show the range, from a full layout change to a refresh that keeps the footprint.

BeforeBoynton Beach, FL kitchen before the remodel, with the original cabinets and granite counters
AfterRemodeled kitchen in Boynton Beach, FL with white shaker cabinets, center island and stainless chimney hood, by KMR Enterprises

Boynton Beach kitchen, before and after.

3Cabinets and appliances set the calendar

Cabinets and major appliances are ordered early because they are the longest wait on the job. Appliance specs also feed the plan: a 48 inch range, a built-in fridge or a steam oven each change the electrical, gas and ventilation work. Choose appliances before the electrician rough-in, not after.

Rule of thumb. If an item has a long lead time or changes the rough-in, decide it before demolition starts. Finishes can wait. Anything behind the wall cannot.

4Permits in Delray Beach

Moving walls, plumbing, gas or electrical needs a permit with the City of Delray Beach Building Division, and the work is inspected in sequence. If your plan is mostly cosmetic, ask the Building Division whether it needs a permit before you assume it does not. Condos and HOAs add their own approvals, including elevator reservation and work-hour limits, so ask for those in writing before the schedule is final. Our permit walkthrough covers the county side.

How to take weeks off the permit

The permit is the part of a kitchen schedule most homeowners underestimate. A permitted kitchen needs plans, licensed subcontractors and permit fees, and approval typically takes 6 to 8 weeks or more. Florida law lets a licensed private provider handle plan review and inspections instead of waiting on the city’s queue.

“At KMR, we recommend paying a little extra to hire a private provider to handle the permit approvals and inspections. For a typical kitchen, this would add around $1,500 but would save 4 to 8 weeks on the overall completion.” Kris Schlembach, owner, KMR Enterprises

Remodeled Wellington, FL kitchen with a granite island seating four, white cabinets, navy tile backsplash and new plank floors, by KMR Enterprises
A Wellington kitchen with a granite island, navy tile backsplash and new plank floors.

5Where the money goes

Cabinets, countertops and appliances are the large lines. Demolition, plumbing, electrical and permits are the quiet ones that surprise people. Our 2026 kitchen cost breakdown lays them out line by line.

For a sense of range: KMR has completed kitchens from about $20,000 to more than $300,000, and a small kitchen can start around $15,000. The two questions that move the price most are whether any walls are moving and whether appliances are being relocated or added, because those bring electrical, plumbing and concrete trenching with them. Access matters too: upper floors in condo buildings, elevator scheduling and parking all add cost.

6How long it takes and what you will live with

The build itself is a series of steps that depend on each other: demolition, rough plumbing and electrical, inspections, cabinets, counters, finish work. See how long a kitchen remodel takes for a realistic timeline, and whether to live at home during the work before you decide. South Florida adds its own wrinkles, covered in how kitchen remodels differ here.

Boca Raton, FL kitchen remodel with cream raised-panel cabinets, glass-front uppers and black granite counters
Cream cabinetry with glass-front uppers and black granite, from a Boca Raton remodel.

How we run it

Every KMR project follows the same six steps: a free consultation, an itemized proposal, permitting, construction with daily logs and photos in JobTread, a final walkthrough, and a warranty. Payments are tied to milestones, and changes happen only by written change order.

Questions homeowners ask

How long does it take to plan a kitchen remodel?

Plan on weeks of design and selections before construction starts, because cabinets and appliances have the longest lead times. Your contractor should give you a written schedule before the work begins.

Do I need a permit to remodel my kitchen in Delray Beach?

If the work moves or changes plumbing, gas, electrical or walls, yes. The work is inspected in sequence by the City of Delray Beach Building Division.

What makes a kitchen remodel in South Florida different?

Humidity, salt air and impact-rated windows and doors change which materials last and which approvals you need.

Can I stay in my home during a kitchen remodel?

Many homeowners do, with a temporary kitchen set up. It depends on how long the kitchen is out of use and who lives in the house.

Can you speed up a kitchen permit in Delray Beach?

Yes. A kitchen permit typically takes 6 to 8 weeks or more. Hiring a licensed private provider to handle plan review and inspections adds about $1,500 on a typical kitchen and can save 4 to 8 weeks on overall completion.

How much does a kitchen remodel cost in Delray Beach?

KMR has completed kitchens from about $20,000 to more than $300,000, and a small kitchen can start around $15,000. Moving walls and relocating appliances drive the price more than finishes do.

Planning a kitchen in Delray Beach?

KMR Enterprises is a Florida certified general contractor (CGC1520685) with a 4.9 rating on Google.

Book a free consultation Kitchen remodeling in Delray Beach